ISE 3400
Transcript Abbreviation:
Prod Pln & Fac Des
Course Description:
Introduction to production systems control: deterministic and stochastic, static and dynamic, single-stage and multi-stage inventory control, MRP systems, just-in-time, scheduling. Facility and machine location models, storage models (warehouse, ASRS), simple layout models, systematic layout planning with applications in manufacturing, health care, service and logistics.
Course Levels:
Undergraduate (1000-5000 level)
Designation:
Required
General Education Course:
(N/A)
Cross-Listings:
(N/A)
Credit Hours (Minimum if “Range”selected):
4.00
Max Credit Hours:
4.00
Select if Repeatable:
Off
Maximum Repeatable Credits:
4.00
Total Completions Allowed:
(N/A)
Allow Multiple Enrollments in Term:
No
Course Length:
14 weeks (autumn or spring)
12 weeks (summer only)
Off Campus:
Never
Campus Location:
Columbus
Instruction Modes:
In Person (75-100% campus; 0-24% online)
Prerequisites and Co-requisites:
Prereq: 3200, Stat 3470, and enrollment in ISE or Engineering Physics major. Additional prereq for students enrolled in ISE major: ISE 3600.
Electronically Enforced:
No
Exclusions:
(N/A)
Course Goals / Objectives:
Identify modern alternatives for production system control
Apply quantitative models to the operation of a production system
Understand where each method is appropriate
Understand how each subsystem relates to the overall production system
Understand the integration of production planning, inventory control, scheduling, shop floor control and operational execution, etc. under the umbrella of facility logistics.
Define and communicate the requirements for a new or renovated facility;
Create viable alternative layouts to efficiently perform the intended facility activities;
Specify appropriate material handling methods and equipment for the facility;
Define and include appropriate personnel requirements in a facility layout;
Quantitatively evaluate alternative facility designs, select the best design, and present the design in a professional manner.
Check if concurrence sought:
No
Contact Hours:
Topic | LEC | REC | LAB | LAB Inst |
---|---|---|---|---|
Definitions | 6.0 | 0.0 | 0.0 | 0 |
Inventory Planning Models: Static vs. Dynamic, Deterministic vs. Stochastic, Single-stage vs. Multi-stage | 15.0 | 0.0 | 0.0 | 0 |
Materials Requirement Planning, Enterprise Resource Planning | 6.0 | 0.0 | 0.0 | 0 |
JIT Systems | 6.0 | 0.0 | 0.0 | 0 |
Scheduling | 6.0 | 0.0 | 0.0 | 0 |
Defining requirements of a facility | 0.0 | 0.0 | 0.0 | 0 |
Developing alternate facility plans; quantitative methods | 0.0 | 0.0 | 0.0 | 0 |
Evaluating, selecting and presenting facility plans | 0.0 | 0.0 | 0.0 | 0 |
Total | 39 | 0 | 0 | 0 |
Grading Plan:
Letter Grade
Course Components:
Lecture
Grade Roster Component:
Lecture
Credit by Exam (EM):
No
Grades Breakdown:
Aspect | Percent |
---|---|
Homeworks / Projects | 30% |
Midterms / Quizzes | 40% |
Final Exam | 30% |
Representative Textbooks and Other Course Materials:
Title | Author | Year |
---|---|---|
Production and Operations Analysis | S. Nahmias | |
Design and Analysis of Lean Production Systems | R.G. Askin and J. B. Goldberg |
ABET-CAC Criterion 3 Outcomes:
(N/A)
ABET-ETAC Criterion 3 Outcomes:
(N/A)
ABET-EAC Criterion 3 Outcomes:
(N/A)
Embedded Literacies Info:
Attachments:
(N/A)
Additional Notes or Comments:
(N/A)
Basic Course Overview:
ISE_3400_basic.pdf
(11.26 KB)